|
|
|
||||||
|
MWH's Mobile Trailer-Mounted Water Treatment Pilot Plants |
|
Two mobile water treatment pilot plants are available for testing sites where pilot equipment housing facilities are not available. These 8.5-foot x 48-foot trailers are easily moved to the site for set-up and testing. They can be leased on a short- or long-term basis. One pilot plant includes a full water treatment train, including:
The other pilot plant includes a high-pressure membrane treatment train that can be:
Each trailer includes:
|
||
| Go to top of page |
||
| ©
2008 MWH. All Rights Reserved. |
||